Wastewater treatment plant RHV Salzburg Ennstal

endurance runner basic flizz® protects the energy and signal supply in snow and frost

A robust and weather-resistant system for year-round operation of the wastewater treatment plant

Profile

  • What was needed: basic flizz® system, energy chain
  • Requirements: long journey, high and low temperatures, snow and frost, continuous load (365 days/year in operation)
  • Industry: Wastewater treatment plant
  • **Success for the customer:**Low-maintenance system that withstands the conditions and enables long travel distances
The secondary clarifier at the Radstadt wastewater treatment plant

Problem

Solution

Following the positive experience with the grit chamber, the 46.5 metre long secondary clarifier was also equipped with the energy supply system.
The path of the scraper with waste water from the sewage treatment plant

basic flizz® system

Basic flizz® product photo

Assistance pour les demandes

Pour toute question supplémentaire ou information sur les produits, veuillez contacter :

igus® Inc. Canada+1 800 965 2496Courriel