Energy chain wrapped around the crane leg

New energy supply concept for heavy-duty ship cranes

IMG_6096 copy

Profile

  • What was needed: "multi-rotation module", also known as "RBR", consisting of two E4.1 energy chains, chainflex cables, steel construction
  • Requirements: Energy supply to the boom of the turbine, sensitive environmental conditions due to use on the high seas
  • Industry: Crane construction
  • Success for the customer: completely new energy supply system especially for this application, preliminary testing of the application in the laboratory, complete delivery including pre-assembly, assembly and delivery