energy chain and cable for continuous operation in waste bunkers

Profile

  • What was needed: readychain® energy supply system incl. all necessary special parts, plates and machine parts
  • Requirements: heavy utilisation of the solution in continuous operation, heavy dust load in the waste bunker
  • Industry: Composting and waste incineration plants
  • Success for the customer: Reliable chain system that can also withstand the aggressive environmental conditions, provision of the ready-to-install system on the specified installation date
Special waste recycling plant

Problem

Solution

Energy chain
Energy chain

Before and after: the operator is delighted with the difference.

Assistance pour les demandes

Pour toute question supplémentaire ou information sur les produits, veuillez contacter :

igus® Inc. Canada+1 800 965 2496Courriel